Scope Management Cheat Sheet

PMP scope management quick reference — WBS, requirements, scope creep vs gold plating, and validation.

Scope Management — Quick Reference

Product Scope vs. Project Scope

  • Product scope — Features and functions of the product (measured against requirements)
  • Project scope — Work required to deliver the product (measured against the project management plan)

Work Breakdown Structure (WBS)

  • Hierarchical decomposition of the total scope
  • Lowest level = work package
  • 100% Rule: WBS must include 100% of the work defined by the scope
  • WBS Dictionary: describes each element (description, milestones, costs, resources)
  • The WBS is scope — if it's not in the WBS, it's not in the project

Scope Creep vs. Gold Plating

Scope CreepGold Plating
WhatUncontrolled scope additionsExtra features beyond scope
WhoStakeholders/customersProject team
Approved?Not through change controlNot requested
Both are badNeither should happen — use change control

Validate Scope vs. Control Quality

Validate ScopeControl Quality
FocusCustomer acceptanceCorrectness of deliverables
WhoCustomer/sponsorQA/QC team
OutputAccepted deliverablesVerified deliverables
WhenAfter Control QualityBefore Validate Scope

Requirements Collection Techniques

  • Interviews — One-on-one, detailed requirements gathering
  • Focus Groups — Group discussion with pre-qualified stakeholders
  • Workshops — Cross-functional group sessions for alignment
  • Questionnaires/Surveys — Large audience, statistical analysis
  • Brainstorming — Generate ideas without judgment
  • Prototyping — Build models to clarify requirements
  • Observation — "Job shadowing" to understand actual work